Author Information
Suming has 78 Published Articles

China,
Pu Dong,
Shanghai,
No.416 Jianye Road,South Jinqiao Area,Pudong, Shanghai, China ,



Install Jaw Crusher,How To Install Jaw Crusher,Jaw Crusher Preparations

Posted On : Mar-18-2011 | seen (349) times | Article Word Count : 436 |

Install Jaw Crusher is generally installed above the concrete foundation. Given the weight of a larger crusher, poor working conditions, and the machine in operation again with great force of inertia to promote the foundation and the machine phylogenetic vibration.
Install Jaw Crusher is generally installed above the concrete foundation. Given the weight of a larger crusher, poor working conditions, and the machine in operation again with great force of inertia to promote the foundation and the machine phylogenetic vibration. Based on vibration are directly caused by other machinery and equipment and building structures vibration. Therefore, the basis of crusher must be separated with the plant base. Meanwhile, in order to reduce vibration, the crusher is placed between the foundation and frame pad rubber or timber.
How To Install Jaw Crusher? Proper operation is to ensure a continuous work crusher one important factor. Improper operation or negligence in the operation, often caused by equipment and personal accident important reasons. Correct operation is to strictly follow the rules and regulations.
Jaw Crusher Preparations the start of work: In the jaw crusher to start, it will have the equipment to conduct a comprehensive double-check: Check the wear plate broken teeth, adjusting well Pai mine mouth size; check whether the ore crushing cavity, if large ore, must be removed; connection bolt is loose; pulley and flywheel housings to protect the integrity of; triangle belt and bar spring tightness is appropriate; storage tank (or the dry oil oil storage device) of the fill level of oil and lubrication systems good situation; electrical equipment and signal systems are in working and so on.
Notes on operation:
Start crushing machine, it should be starting the first oil pump motor and cooling system, after 3-4 minutes, until the oil pressure and oil flow indicator is normal, and then activate the crusher motor.
After startup, if the crusher is not a normal issue of percussion sound, should stop operation, to identify and eliminate defects, restart the machine.
Breakers must be empty to start, starts after a period of time, in normal operation before starting to mine equipment. Into the crusher to the ore should be gradually increased until the full load operation.
Operation should be noted that even to the mine, ore crushing chamber packed allowed; and the maximum size to the ore block to the mine mouth should not be larger than 0.85 times the width. At the same time, when the guard shovel to mine the shovel teeth and the drill rig and other non-crushing objects into the crusher. Once the discovery of these non-crushing objects into the crushing chamber, but through the port of discharge of the machine, it shall immediately notify the belt transport jobs out in time to avoid a crushing machine to the next, resulting in serious device incidents.

Article Source : http://www.articleseen.com/Article_Install Jaw Crusher,How To Install Jaw Crusher,Jaw Crusher Preparations_56423.aspx

Author Resource :
Install Jaw Crusher

How To Install Jaw Crusher

Jaw Crusher Preparations

Keywords : Install Jaw Crusher, How To Install Jaw Crusher, Jaw Crusher Preparations,

Category : Business : Business

Bookmark and Share Print this Article Send to Friend